- Your project and requirements
- An indicative cost estimate
- Three AI concept designs (illustrative)
- Approved professionals near you
For homeowners
You will make sixty-seven material decisions building your home. We make you a competent buyer, not a construction expert: the cost in writing, quotes on equal scope, and independent checks before anything is covered up.
1Stage 01 · Plan
Costed first
A written Build Plan and quotes priced on one scope, before a brick is laid.
2Stage 02 · Verify
Checked before it is covered
Independent checks at six stages, from the footings to the terrace.
/ 6 checks passed
3Stage 03 · Record
Yours, on record
Drawings, bills, photos and warranties, kept for the life of your home.
01Plan
Your requirements, cost, and complete Build Plan
02Compare
Standard RFQ and apples-to-apples quotes
03Select
Choose the right contractor with full clarity
04Build
Track decisions, procurement and stage progress
05Verify
Independent inspections at six key stages
06Your Build Record
A permanent record for your home
01 · The problem
Quotes that never price the same scope. Decisions made in a hurry on site. Money that runs out mid-build. And at the end, land with papers and a house with none.
67
Material decisions, most made under pressure
16
Construction stages to coordinate
6
Stages that cannot be undone once covered
1
Chance to get it right: a family builds once
02 · Free, then one package
Your dashboard opens the moment you submit your requirements. When Plan2Build accepts your project, one package unlocks the rest of the journey. You never pay us for a contract.
- 01Submit
- 02We review
- 03Accepted
- 04Package
- Intelligence: your Build Plan, BOQ, specifications, quotes compared on one scope
- Transaction: introductions to verified professionals
- Assurance: independent checks at six gates and your Build Record
No. We never take your construction contract. You sign directly with the contractor you choose and pay them directly. We write the plan, make the quotes comparable and check the work.
Before you buildYes. We never replace the contractor your family has chosen. With the Intelligence package, invite them to quote against your Build Plan, and their quote is read against the same scope as any other.
Before you buildA cost estimate with a stage-wise budget, a Build Plan built on approved drawings, a bill of quantities, a stage-by-stage schedule, a cash-flow plan and the 67 material decisions written as performance. A registered structural engineer signs off the structural items, and contractor quotes are compared on that one scope.
Before you buildNo, and it does not pretend to be. It gives a likely budget for your built-up area and construction quality, before and after contingency, with the time to build. Estimates are indicative and vary with site conditions, design and specification.
Before you buildYou pay for the package you choose. We specify the performance needed (grade, class, rating), never a brand, and the choice of product is yours. No brand can pay for position.
Before you buildAn independent engineer retained by Plan2Build, never your contractor's, and never told who supplied the material. The six gates are the foundation before pouring, the plinth beam, every slab before pouring, before plastering, waterproofing and the final snag check.
During the buildEither side raises the change with its reason, cost and time impact. Plan2Build qualifies and quantifies it, the other side confirms by OTP, and the contract value and completion date update for both. If you disagree, we lead the discussion until it is closed.
During the buildWith the Assurance package, your Build Record: the specification, the inspections and their findings, the documents and warranties handed over, and the history of the build. You can download it and keep it.
After handoverYour house data belongs to you. Brands never receive your name, address or contact details.
After handoverWe are starting with families building in Mumbai. Building somewhere else? Call us and we will tell you honestly whether we can help.
Before you build
04 · Plan a project
Your plot, your area and roughly when you want to start. We come back with an indicative budget by cost head, and your first decisions.
Build plan requestTakes one minute
01What do you need help with?
02When do you want to start?
03Drawings or quotes
Drop drawings or contractor quotes herePlot papers, sketches, drawings or quotes67 decisions · 16 stages · 6 independent inspections · 1 permanent build record
ConjunIQ Technologies Private Limited




