Plan to build · Mumbai

Services

Six services, from a free cost check to independent checks at every stage that cannot be undone. Use one, or use them all.

67 decisions · 16 stages · 6 independent inspections · 1 permanent build record

ConjunIQ Technologies Private Limited

04 · How a house gets built

The 16 construction stages fall into five phases. Your workspace tracks each one with planned and actual dates, and every decision comes up before the stage that needs it.

20 months · Plan to handover · 2,650 sq ft, G+1 · indicative

  1. 01 · Stage 01Months 0–3

    Plan

    1. 01Drawings & approvals
  2. 02 · Stages 02–04Months 3–6

    Foundation

    1. 02Site prep & excavation
    2. 03Foundation & footingsGate 1
    3. 04Plinth & backfillingGate 2
  3. 03 · Stages 05–08Months 5–11

    Structure

    1. 05Columns & beams, each floor
    2. 06Slab casting, each floorGate 3
    3. 07Blockwork & brickwork
    4. 08Roof, parapet & staircase
  4. 04 · Stages 09–15Months 10–18

    Services & finishes

    1. 09Concealed wiring & pipesGate 4
    2. 10WaterproofingGate 5
    3. 11Plastering
    4. 12Doors, windows & grills
    5. 13Flooring & tiling
    6. 14Fittings & sanitary
    7. 15Painting & finishes
  5. 05 · Stage 16Months 17–20

    Handover

    1. 16External works & handoverGate 6

08 · Home Cost Check

Two answers give you a likely range and the time to build. Free, with no sign-up.

₹0to find out what your house should cost

Home Cost CheckPlan2Build

01Built-up area, all floors

1,250sq ft

02Construction quality

Likely cost

Time to build

Likely cost: … to …. Time to build: about … months.

Indicative, excluding land; range shown before and after contingency

See what your house should cost

10 · Questions

Something else? Call or email hello@plan2build.in.

  • No. We never take your construction contract. You sign directly with the contractor you choose and pay them directly. We write the plan, make the quotes comparable and check the work.

    Before you build
  • Yes. We never replace the contractor your family has chosen. With the Intelligence package, invite them to quote against your Build Plan, and their quote is read against the same scope as any other.

    Before you build
  • A cost estimate with a stage-wise budget, a Build Plan built on approved drawings, a bill of quantities, a stage-by-stage schedule, a cash-flow plan and the 67 material decisions written as performance. A registered structural engineer signs off the structural items, and contractor quotes are compared on that one scope.

    Before you build
  • No, and it does not pretend to be. It gives a likely budget for your built-up area and construction quality, before and after contingency, with the time to build. Estimates are indicative and vary with site conditions, design and specification.

    Before you build
  • You pay for the package you choose. We specify the performance needed (grade, class, rating), never a brand, and the choice of product is yours. No brand can pay for position.

    Before you build
  • An independent engineer retained by Plan2Build, never your contractor's, and never told who supplied the material. The six gates are the foundation before pouring, the plinth beam, every slab before pouring, before plastering, waterproofing and the final snag check.

    During the build
  • Either side raises the change with its reason, cost and time impact. Plan2Build qualifies and quantifies it, the other side confirms by OTP, and the contract value and completion date update for both. If you disagree, we lead the discussion until it is closed.

    During the build
  • With the Assurance package, your Build Record: the specification, the inspections and their findings, the documents and warranties handed over, and the history of the build. You can download it and keep it.

    After handover
  • Your house data belongs to you. Brands never receive your name, address or contact details.

    After handover
  • We are starting with families building in Mumbai. Building somewhere else? Call us and we will tell you honestly whether we can help.

    Before you build